Construction area at Hamburg’s U5 City Nord station, between office buildings, with materials and a crane.
← Back to projects

Infrastructure / Rail / Architecture

U5 East · Hamburg

Station architecture, design review and construction preparation for U5 East.

Hamburg, Germany
U5 City Nord construction, 2 September 2026. A later stage of the project; my work at HOCHBAHN ran from November 2023 to February 2024.Flor!an · CC BY-SA 4.0 · Source
My roleProject Lead · Architecture & Stations
OrganisationHOCHBAHN U5 Projekt GmbH
My involvementNovember 2023 – February 2024
Scope of workStation fit-out · City Nord focus

01Project context

New stations for Hamburg.

U5 East brings station architecture, structural works and building systems together. At HOCHBAHN U5 Projekt GmbH, my focus was detailed design review and preparation for construction, particularly at City Nord.

The task

Station fit-out brings together structural, architectural and building-services design. Understanding their interfaces was essential to preparing the next stages of work.

02My responsibilities

The responsibilities described here were carried out within the named organisation and project team.

  1. 01

    Reviewed construction drawings and design information for stations in the first section of U5 East.

  2. 02

    Analysed site and construction conditions and prepared a construction-preparation document focused on City Nord.

  3. 03

    Coordinated planning questions through project meetings with internal colleagues and external designers.

Methods & tools

Planning reviewConstruction logisticsMultidisciplinary coordination

Deliverables

  • Station-planning reviews and analysis of construction conditions.
  • A documented basis for construction preparation at City Nord.

Project location

U5 Ost in context.

The first section links Bramfeld and City Nord through five stations, including the U1 interchange at Sengelmannstraße. The official network plan shows the geography; my responsibilities are described above.

Original schematic · not to scale · not an approved route alignment.

Official plans & sources

Hamburg network overview · official PDF downloadU5 Ost · official section information
Read a text description

Planned U5 Ost station sequence: Bramfeld, Steilshoop, Barmbek Nord, Sengelmannstraße (U1 interchange), City Nord (Stadtpark).

The links lead to original plans on the official project websites. This overview provides context and does not replace a technical location plan.